Post construction cleaning checklist
- Checklist items
- 63
- Computed on this page from the inputs below
- Cleaner-hours
- 10
- Computed on this page from the inputs below
- Elapsed hours with the crew
- $3.20
- Computed on this page from the inputs below
- Labor cost
- $268.80
- Computed on this page from the inputs below
Every figure on this page is computed from the inputs you enter, by the method stated below it. The only constants DailyLogDesk supplies are the published reporting clocks and assessment steps, each cited where it is used. The defaults are a worked example to replace with your own.
Email me this result
We will send you these figures and a link back to them. One email, nothing else unless you tick the box.
The figures above start from a worked example (63). Change any input and the answer updates as you type.
Download the Post construction cleaning checklist worked example (CSV)
This scopes a post-construction clean before the crew arrives. Enter the floor area, the rooms and areas, the cleaning phase, the cleaners, the rate per cleaner and your crew's pace in square feet per cleaner-hour, and the page returns the checklist items for that phase, the cleaner-hours, the elapsed time with the crew, the labor cost and the cost per square foot. A rough clean after drywall, a final clean before handover and a touch-up after the punch list are three different jobs, and the page sizes each.
The phase decides the list
A rough clean removes construction debris, dust and stickers so the finishing trades can work; a final clean is every surface, fixture, window and floor to handover standard; a touch-up puts right what the punch list disturbed. The page counts the items per phase and adds the per-room items, because a final clean of a nine-room house is a longer list than a rough clean of the same shell.
Pace is yours, and it is the whole estimate
Square feet per cleaner-hour is the figure that turns area into hours, and it varies with the phase, the finish and the crew. Put in your crew's real pace for this phase rather than a rule of thumb, because the hours, the cost and the price all hang off it.
Cost per square foot is the number to quote against
General contractors and builders ask for a price per square foot for a final clean. The page prints your labor cost per square foot from your own rate and pace, so the price you quote sits on a number you can defend rather than on what the last builder paid.
Post construction cleaning checklist: common questions
Is this a free post construction cleaning checklist?
Yes: the items, the hours and the cost are computed here for free with no account, and you can print the checklist figures. DailyLogDesk Pro turns it into the checklist document with your company name on it, files it against the project, and collects the sign-off at handover.
What is on a post-construction cleaning checklist?
For a final clean: debris and dust removal, windows and frames inside and out, fixtures and fittings, cabinets inside and out, floors by type, bathrooms and kitchens to handover standard, stickers and labels removed, and a walk-through with the builder. The page counts the items by phase and room; Pro holds the list.
How long does a post-construction clean take?
The worked example, a 2,400 square foot final clean with three cleaners at 250 square feet per cleaner-hour, is the elapsed time on the page. Change the pace or the crew and the figure moves; it is your crew's pace, not an industry average.